Del. no. | Deliverable name | Delivery date (proj. month) |
D1.1 | Quality plan | M03 |
D1.2 | First periodic report | M12 |
D1.3 | Final report | M24 |
D1.4 | 5GCHAMPION impact report and future EU-KR collaboration plan | M24 |
IR2.1 | Preliminary document of 5GCHAMPION architecture, API- and interface specifications approved | M03 |
IR2.2 | Preliminary 5GCHAMPION Key Performance Indicator and use cases defined | M03 |
D2.1 | 5GCHAMPION Architecture, API- and interface document approved | M10 |
D2.2 | 5GCHAMPION Key Performance Indicator and use cases defined and specification document written | M10 |
D3.1 | Front-end design | M06 |
D3.2 | Electronically reconfigurable antenna arrays for backhauling & fronthauling | M15 |
D3.3 | Beamforming antennas and front-end integration | M18 |
D3.4 | Algorithms for backhauling & fronthauling | M12 |
D3.5 | mmWave backhauling & fronthauling platform | M12 |
D3.6 | mmWave backhauling & fronthauling implementation | M22 |
D3.7 | Preliminary results on the mobility framework | M12 |
D3.8 | Final results on the mobility framework | M24 |
D4.1 | Operator grade NFV based and SDN-enriched EPC environment at 5GTN environment | M12 |
D4.2 | Design and implementation report on Mobility Management, Integrated Orchestration and VNFs in a Distributed Mobile Core | M18 |
D4.3 | Deployment and interoperability report on Distributed Mobile Core testbed between Korea and Oulu | M24 |
D5.1 | 5G Satellite Communication analysis - intermediate version | M12 |
D5.2 | 5G Satellite Communication analysis - final version | M24 |
D5.3 | Ubiquitous sub meter accuracy positioning with Galileo and wireless network features – intermediate version | M12 |
D5.4 | Ubiquitous sub meter accuracy positioning with Galileo and wireless network features – final version | M24 |
D6.1 | Access and backhaul: Integration and system testing | M14 |
D6.2 | VNF/SDN/EPC: Integration and system testing | M14 |
D6.3 | Integration and system testing phase of satellite scenario | M24 |
IR6.1 | System level testing of "proof of concept" phase1 | M15 |
D6.4 | System level testing of "proof of concept" phase2 | M24 |
D7.1 | Plan for standardization and dissemination | M03 |
D7.2 | Status of standardization and dissemination and update of plan | M09 |
D7.3 | Organization of a Special Session at a key conference | M12 |
D7.4 | Status of standardization and dissemination and update of plan | M21 |
D7.5 | Showcasing Proof-of-Concept results at a key event | M24 |